Skip to content
ıncudio

Live bill of materials for custom manufacturing

See who made what — live, not in a spreadsheet.

Incudio connects engineering, the shop floor, and the office around a live bill of materials. See real progress on every project and who made and inspected each part — no spreadsheets, no calls down to the shop floor.

Proven over 6 years in real production.

app.incudio.sk/projects/MES-2026-114

Problem

A BOM in a spreadsheet holds you back

Spreadsheets and paper work fine while the company is small. Then they start losing the one thing that matters most: visibility. Here are the four places it hurts the most.

01

You don't know how far along a project is

Progress is scattered across cells, people's heads, and a whiteboard. To know where a project really stands, you have to piece it together by hand — and an hour later it's already out of date.

02

You don't know who made and inspected a part

“Done” in a spreadsheet is just a cell. It carries no name, no time, no inspection. When something goes wrong later, there's no way to trace who made the part and who signed off on it.

03

Route sheets get lost, the overview lives in someone's head

A paper route sheet disappears, a key person is on holiday — and the overview goes with them. The company runs on a few people's memory instead of on a system.

04

Finding a part means digging

“Have we made this part before? On which job, how many pieces?” Scattered spreadsheets have no quick answer — just opening files and making phone calls.

How it works

How it works

Incudio builds your whole production around one live bill of materials. Every step that happens on the shop floor flows into project progress — automatically and instantly.

  1. 01Office

    You create a project

    A new job gets its own number and BOM. Numbering runs automatically — nothing to overwrite by hand.

  2. 02Engineering

    Engineering fills in the BOM

    Parts, materials, surface treatments, operations. The BOM looks the way you work — columns adapt to your company, not the other way around.

  3. 03Office

    The office releases the project to production

    Only a released job is visible to the shop floor. Until then it stays in preparation, and prices and details never reach production.

  4. 04Shop floor

    The shop floor marks operations

    A worker marks a finished operation with their personnel number. An inspector confirms it. The part turns green — and you know who made it and who inspected it.

  5. 05Shop floor

    Project progress moves in real time

    Every confirmed operation advances the whole job's progress. No manual tallying, no “go ask the shop floor.”

Incudio — Ako to funguje Brand mapping (LIGHT): --page/--card = Paper #F5F1EA · --card-2 = Paper2 #EAE4D8 · --ink = Graphite #15181E · --amber = Amber #E0823A · --done = status green AKO TO FUNGUJEKaždá akcia na dielni hýbepostupom projektu. ŽIVÁ SLUČKA · každý hotový diel posúva projekt — naživo, bez prepisovania 01KANCELÁRIAZaložíte projektVlastné číslo + kusovník02KONŠTRUKCIAKonštrukcia naplníkusovníkDiely, materiály, operácie03KANCELÁRIAKancelária uvoľnído výrobySchválené pre dielňu04VÝROBAVýroba označujeoperácieOsobné číslo pri kroku05VÝROBAKontrolór potvrdíDiel zozelenie → Hotovo Živý postup projektuMES-2026-114 · postup sa hýbe sám59 % TRI ROLE, TRI POHĽADYKaždý vidí presne to, čo má. KanceláriaCENA PROJEKTU · € 18 600Vidí všetko vrátane cien.Uvoľňuje kusovník do výrobya sleduje náklady projektu.ČO VIDÍ V KUSOVNÍKUPOZDIELOPERÁCIA001PlášťZváranie002DnoLisovanie003PrírubaSústruženie004HrdloFrézovanieUvoľniť do výrobyCenyUvoľnenieCelý prehľadKonštrukciaPripravuje kusovník — zakladádiely, priraďuje materiálya operácie. Bez uvoľnenia.ČO VIDÍ V KUSOVNÍKUPOZDIELOPERÁCIA001PlášťZváranie002DnoLisovanie003PrírubaSústruženie004— —·····+ Pridať dielKusovníkOperácieUvoľnenieVýrobaVidí len uvoľnené diely —bez cien. Označuje hotovéoperácie osobným číslom.ČO VIDÍ V KUSOVNÍKUPOZDIELOPERÁCIA001PlášťZváranie002DnoLisovanie003PrírubaSústruženie004HrdloneuvoľnenéOznačiť hotovo · 1057CenyLen uvoľnenéOznačovanie
Diagram: the live loop BOM → operations → inspection → project progress, and three roles (office, engineering, shop floor).

Three roles, one overview

The office sees everything including prices and releases jobs. Engineering prepares the BOMs. The shop floor sees only what it needs to make — no prices, no unreleased projects. Everyone sees exactly what they need.

Features

Key features

Everything a small manufacturing firm needs to run its jobs — and nothing extra to wade through.

app.incudio.sk/projekty

Live bill of materials

A central list of parts, materials, and operations for every job. You see the status of each part in real time.

Projects and automatic numbering

Every job has its own number and year. Numbering runs itself — no manual rewriting, no collisions.

Operations with inspection

A worker marks an operation with their personnel number, an inspector confirms it. You have a record of who made each part and who inspected it.

Separate roles and release to production

Three roles (office, engineering, shop floor) with different access. The shop floor sees only released jobs; prices stay in the office.

Material database

Customers, suppliers, materials, and surface treatments in one place. Entered once, always on hand.

Search across jobs

Find a part across every project at once — where it was used, on which job, and how many pieces.

Deadline indicators

Approaching and overdue deadlines are visible at a glance. No job slips through.

Copy a project

Copy a recurring job along with its BOM and don't start from scratch.

Export and notifications

Export your data to a spreadsheet when you need it elsewhere. Incudio emails you when a job is released and when it's completed.

Apps

Apps

Extend Incudio with more tools as your company grows. The core stays simple — you add only what you'll actually use.

Available

Gantt — project schedule

The phases of a job and their dependencies in a clear schedule. See what's running, what's next, and where it might stall.

app.incudio.sk/gantt

Coming soon

Coming soon
  • Quotes
  • Cutting plans
  • Route-sheet printing
  • CAD import
  • Purchase-order generation
  • Inventory management

Have something that would help you? Tell us at the demo — we build the roadmap around real shops.

Why Incudio

Why Incudio for custom manufacturing

There's no shortage of project tools. Few of them understand how custom, build-to-drawing manufacturing actually works. Incudio is built exactly for it.

  • Built for jobs, not stock

    Incudio revolves around the project and its BOM — custom and small-batch, build-to-drawing work. Not around stock levels and repeat products.

  • Simple for the shop floor

    A worker enters a personnel number and clicks. No training, no menus to get lost in. A system the shop floor actually uses.

  • Adapts to your BOM

    The columns and structure of the BOM follow the way you work. You don't adapt to the software — the software adapts to you.

  • No big-system bloat

    No months-long implementation, no modules you'll never use. Incudio handles production and the BOM, not your whole company — which is what makes it fast to deploy.

  • Your data, your rules

    Hosted by us in the cloud, or on your own server — whichever suits your company. More in the section below.

Deployment

Deployment and data security

Your production data — bills of materials, customers, materials — is sensitive. So you choose where it lives.

Cloud

Recommended for most firms

We host it, you just log in. No server, no maintenance. Data is in the EU, access is encrypted and separated by role, and sensitive actions are logged.

Managed — on your server

Incudio runs on your server or VPS; we take care of operations and updates. Your data never leaves your infrastructure.

Self-hosted — full control

On request

For firms with strict data policies. Incudio runs entirely in your environment, under your administration.

Your data is yours

Whichever model you choose, one thing holds: your production data belongs to you. You decide where it's stored and who has access.

Reference

A real customer, not a prototype

Incudio isn't a new app looking for its first user. It was built and has run for six years in a real manufacturing company — developed directly with them, on their day-to-day work. What you see has been tried on the shop floor, not on paper.

6 years
in real production
Daily
on live jobs

Pricing

Pricing

Every manufacturing firm is different — in size, in how many people are on the shop floor, and in how it wants to run Incudio. So we set pricing to fit, not from a price list.

Get in touch and at the demo we'll work out what makes sense for your firm.

Contact

See Incudio on your own jobs

At the demo we'll show you what Incudio would look like for your production. We'll set it up and you'll try it in practice.

info@incudio.com

We'll get back to you as soon as possible. We'll use your details only to contact you about Incudio.

Incudio — job-shop production & BOM tracking